Mission Critical

Walnut Creek

Posted by on Friday, July 27th, 2012 in Mission Critical

The Walnut Creek Switching Facility project included the construction of a new telecommunications switching facility and a building addition to the existing facility in Walnut Creek, CA. The case-in-place concrete and structure steel building encompasses 52,033 SF. This new facility is one of several switching facilities in the Bay Area communication grid and designed to […]

Read More

Transbay Cable

Posted by on Friday, July 27th, 2012 in Industrial, Mission Critical

Roebbelen constructed two high voltage direct current (HVDC) electrical converter stations to transmit electrical power from a converter station in Pittsburg to a converter station in San Francisco. Work included the erection of a pre-engineered Administration Building, spare parts enclosure, and converter building at each site. Roebbelen also furnished all the reinforced concrete foundation and […]

Read More

Willow Technical Center

Posted by on Thursday, July 26th, 2012 in Mission Critical

Installation of redundant mechanical and electrical system, grow equipment space, and seismic retrofit of the 40,000 SF data center. Entire project was built on a raised floor. Name: Willows Technical Center Location: Redmond, WA Owner: Private Telecommunications Company Architect: N/A

Read More

Black Hawk Data Center

Posted by on Thursday, July 26th, 2012 in Mission Critical

12,000 SF building addition to existing private telecommunications companies switching facility. This unique project was constructed on a hillside with adverse soil conditions. The new and existing facility was pinned down with caissons and protected by a 20 foot high retaining wall featuring 150 caissons to stop soil movement from affecting this critical facility. The […]

Read More

Winton Way Data

Posted by on Thursday, July 26th, 2012 in Mission Critical

Various infrastructure projects to maintain critical east bay data center for large telecommunications company. Scope of work included generator replacements, data cable mining, redundant cooling systems, raised floor installations and power upgrades. Name: Various Projects Location: Winton Way, Hayward, CA Owner: Private Telecommunications Company Architect: Salas O’Brien

Read More

GSA Build-To-Suit

Posted by on Wednesday, July 25th, 2012 in Federal Facilities, Industrial, Mission Critical

This facility is approximately 33,000 SF, concrete tilt-up building designed to accommodate clean room manufacturing and office space. This design-build project will be LEED Silver certified. This building will feature redundant mechanical and electrical systems. Approximately 24,000 SF of the building will be constructed on a raised floor. Name: GSA Build-to-Suit Lease Location: McClellan Park, […]

Read More

Hacienda Call Center

The project consists of 150,000 SF of offices, training rooms, call center, and data center space. This building features redundant mechanical and electrical systems and a separate generator building. This space was constructed entirely on a raised floor. This was a fast-track project that delivered the first 50,000 SF in six months from design inception. […]

Read More

Owens Drive Data

Posted by on Monday, March 26th, 2012 in Mission Critical

Upgrade of mechanical and electrical system, grow equipment space, and seismic retrofit of the data center. Entire project was built on a raised floor. Name: Data Center Retrofit Location: Pleasanton, CA Owner: Private Telecommunications Company Architect: Carter Burgess, Inc.

Read More

UCSF Data Center

Posted by on Sunday, February 26th, 2012 in Higher Education, Mission Critical

The new Data Center project consolidates multiple small IT and server closets located across the entire UCSF campus into a single facility that could be more efficiently monitored and serviced. The initial size of the data center is 7,900 square feet, with adjacent expansion space to allow it to grow to a total of 11,000 […]

Read More