Leroy F. Greene Academy

Back to Projects

The rehabilitation of this school included new exterior finishes, replacement of expansion covers at walls and roof and site accessibility and paving upgrades. ADA upgrades were made to the entire campus. There was a complete interior renovation of all finishes and cabinets throughout the campus. New exterior concrete seat walls, science sinks, tree wells, and landscaping and irrigation were installed. All single pane windows were replaced with insulated low-E safety tempered glazing. All non-compliant exterior door hardware was replaced with accessible lever hardware and listening devices installed in the Gymnasium and Multi-Purpose Buildings. A new steel framed, free standing trellis was installed at the Library, Administration and Gymnasium entries.

Name: 
Leroy F. Greene Academy Rehabilitation
Location: 
Sacramento, CA
Owner: 
Natomas Unified School District
Architect: 
Stafford King Wiese