PG&E Cinnabar Service Center
Roebbelen’s Role:
Contractor
Location:
San Jose, California
Owner:
PG&E
Engineer:
Blair, Church, and Flynn
Delivery Method:
Design Bid Build
Construction Cost:
$1,500,000
Project Timeline:
Start Date:
2020
Completion Date:
2022
PG&E Cinnabar Service Center
Roebbelen’s Role:
Contractor
Location:
San Jose, California
Owner:
PG&E
Engineer:
Blair, Church, and Flynn
Delivery Method:
Design Bid Build
Construction Cost:
$1,500,000
Project Timeline:
Start Date:
2020
Completion Date:
2022
PG&E Cinnabar Service Center
Making A Service Center Secure
Perimeter Security in San Jose includes 10-foot wall and landscaping
Longtime customer PG&E needed perimeter security at its Cinnabar Service Center in central San Jose. The project consisted of designing and building a 10-foot precast wall around the site, along with new gates, controls, and landscaping.
The project included:
• 1,700 feet of 10’ tall Ledgestone Precast Wall
• 7 gates with 5 new custom louvered automated drive gates
• HySecurity gate operators
• Engineered wall system
• Drought-tolerant landscaping